A 200 TPD Cashew Nut Processing Plant in Lokoja, Kogi State, Nigeria. A 3-Phase Equity Investment transforming Nigeria’s cashew industry.

$18MPhase 1 Target
$68MTotal Programme
200 TPDProcessing Capacity
Q4 2027Revenue Start

Why Invest

Empowering Communities.
Sustaining Livelihoods.

Register for exclusive access to project documents, investment summaries, financial projections, and direct communication with the Natari Group investment team.

📄

Project Documents

Access prospectus, financial models, legal structure and project timelines.

📈

Investment Tracking

Monitor live investment progress with real-time tentative and confirmed bars.

💬

Direct Enquiry

Send your investment message directly to the Natari team from your dashboard.

NATARI INTEGRATED KOGI LTD

The Cashew Project

200 TPD Cashew Nut Processing Plant • Lokoja, Kogi State
3-Phase Equity Investment • $68M Programme • Phase 1: $18M • March 2026

$18M

Phase 1 — Start Now

$68M

Total Programme

200 TPD

Full Capacity

Q4 2027

Revenue Starts

THE PROBLEM

The Structural Gap

Nigeria sits on a cashew goldmine — and ships it all away unprocessed.

 

<10%

Of annual cashew harvest processed domestically

>90%

Exported raw — value captured by Vietnam & India

3–5x

Value uplift lost per tonne: $400–600/MT vs $750–1,500/MT

7 of 12

Existing processing facilities operational — huge supply gap

ZERO

Modern fully-automated facilities in North-Central RCN belt

THE OPPORTUNITY

First-Mover Advantage in Nigeria’s Most Productive Cashew Corridor

Nigeria is Africa’s 4th-largest cashew producer with rapidly accelerating export revenues — $219M H1 2024 rising to $398M H1 2025, an 81% surge in one year. Kogi State sits at the geographic heart of this production corridor. No investor has yet built a modern, full-automatic facility here. The first-mover advantage is real, measurable and available now.

THE SOLUTION

A Fully-Automated, Zero-Waste Complex

Four revenue streams from one input. Nigeria’s most advanced cashew processing facility, built in 3 phases on 20.154 Ha in Lokoja.

01

CASHEW KERNELS

W180/W240/W320/W450 — Export-grade, ready-to-eat. Target: EU, US, India, Asia.

72%

of total revenue

02

CNSL OIL

Cashew Nut Shell Liquid — Industrial resins and polymers. $350–$600/MT.

18%

of total revenue

03

TESTA FERTILISER

Organic pelletised fertiliser. Sold to Kogi smallholders. $80–$150/MT.

6%

of total revenue

04

BIOMASS FUEL

Shell pellets for energy — 15–20% plant energy saving. $40–$80/MT.

4%

of total revenue

PLANT AT A GLANCE

Technical Specifications

Full Capacity200 TPD Raw Cashew Nut (RCN)
Annual Throughput60,000 MT/year (300 working days)
Kernel Output~50 TPD finished kernel per day
AutomationFull-Automatic + Traceability
Power3,025 kW/hour
Labour (Full Ops)986 workers
Site20.154 Ha — Lokoja, Kogi State
TechnologyVCM Vietnam machinery, Thai EPC oversight

MARKET OPPORTUNITY

TAM / SAM / SOM — Global Cashew Market Growing to $14.6B by 2031

TOTAL ADDRESSABLE MARKET

$9.9B (2025)

Growing to $14.6B by 2031 at 6.74% CAGR

Global cashew market — kernels, CNSL, by-products. Driven by health snacking, plant-based diets and food processing in US, EU and Asia.

SERVICEABLE ADDRESSABLE MARKET

$3.3B (2025)

Growing to $5.0B by 2031 at 7.25% CAGR

West Africa commands 84.6% of African cashew production. Nigeria’s export revenue grew 81% in one year to $398M H1 2025 — fastest-growing market.

SERVICEABLE OBTAINABLE MARKET

$45M+ (Year 3)

200 TPD x 300 days x ~$750–800/MT kernel ASP

Conservative 30% Year 1 ramp, full capacity Year 3. CNSL and fertiliser add incremental revenue on top of kernel base.

INVESTMENT STRATEGY

Build It Phase by Phase

Capital drawn in milestone-gated tranches. Revenue funds the next phase. Investors see performance before committing more.

PHASE 1 • Q2 2026–Q4 2027

~$18M

50 TPD Kernel

Foundation + Core Kernel Line. Site preparation, core infrastructure, 50 TPD kernel processing, staff accommodation, QMS and permits.

Year 1 Revenue: $4.5M–$6.8M

PHASE 2 • Q1 2028–Q4 2028

~$28M

150 TPD + CNSL

Scale + CNSL Extraction Plant. Kernel expanded to 150 TPD, CNSL plant live, power upgraded to 10,000 KVA, export logistics.

Phase 2 Revenue: $12.6M–$19M/yr

PHASE 3 • Q1 2029–Q4 2029

~$22M

200 TPD + Fertiliser

Full Capacity + Fertiliser and Biomass Plant. Final 50 TPD module, testa fertiliser plant, biomass fuel unit, zero-waste complex operational.

Full Revenue: $24M–$28M/yr

FINANCIAL PROJECTIONS

5-Year Illustrative Forecast

200 TPD capacity ramp from 30% Year 1 to 100% by Year 5. Kernel ASP ~$1,000–$1,500/MT (W320). Detailed model available on request.

MetricYear 1Year 2Year 3Year 4Year 5
Capacity Utilisation30%60%85%95%100%
RCN Processed (MT)18,00036,00051,00057,00060,000
Kernel Revenue$4.5M–$6.8M$9M–$13.5M$12.75M–$19M$14M–$21M$15M–$22M
Total Gross Revenue~$6.3M~$12.6M~$24M~$27M~$28M
EBITDA (Illustrative)~$5.6M~$11.9M~$23.3M~$26.3M~$27.3M

MARKET VALIDATION & TRACTION

Mandate Confirmed. FEED Complete. Already In Motion.

Formal EPC Mandate Executed

Saencharoen Trading 2018 Co. Ltd. (Bangkok) formally appointed as Business & Factory Consultant — January 2026.

FEED Documentation Complete

Front-End Engineering Design at Rev. 00. Draft layouts, equipment flow diagrams, site schematics (20.154 Ha) — February 2026.

Supplier Quotes In Hand

VCM Vietnam proforma invoice: $5.1M–$6.5M for 200 TPD full automation. Comparative analysis complete — Vietnam selected.

Nigeria Export Market Surging

Cashew export value grew 81% from H1 2024 to H1 2025, reaching $398M — now Nigeria’s 3rd-largest non-oil export.

Government Support & Policy

5-year tax holidays; NEPC Export Expansion Facility grants; Kogi State targeting 70% domestic processing by 2030. KSTPDB and COREN pathway defined.

Ebonyi Hydroponic Pipeline

Natari NIG LTD pre-selected for Ebonyi State Ministry of Agriculture hydroponic project — demonstrating active government relationships.

IMPACT & VISION

Why This Project Matters

Nigeria has the raw material, the land, the farmers and the ambition. What it needs now is the capital and technology to process what it grows. This is that investment.

— Dr. Eseni Ibiam Orji, Founder & MD

1,200+

Direct jobs created at full operation

400,000+

Smallholder farmers get better prices

3–5x

Value uplift retained in Nigeria

Zero-waste

100% of shell and testa valorised

THE PHASED ASK

BUILD IT PHASE BY PHASE.

$68M total. $18M to start. Revenue-funded growth to full capacity.

~$68M

Total Programme

$18M

Phase 1 — Q2 2026

Q4 2027

Revenue Starts

$24M–$28M

Year 5 Revenue